Skip to content
Concrete pilings stacked in an excavated hole beside a settled slab foundation in San Antonio

Foundation repair · San Antonio and the metro

Slab Foundation Repair San Antonio

A corner that dropped under the live oak, brick opening above the garage door, a kitchen floor that rose over a leaking drain. Slab repair in San Antonio starts with an elevation survey and a plumbing test, then piers pressed to refusal on the side that is moving, with the count and the price on paper first.

  • Written Proposal
  • Engineer's Report
  • Permit Pulled
  • Warranty in Writing
  • Slab & Pier and Beam

Request Slab Foundation Repair in San Antonio

Tell us what the house is doing. You get an honest read on urgency and a written proposal after the evaluation.

Written proposal, no obligation
US format - we will call or text you back.
Add a short message (optional)
Timing

Written proposal after the evaluation. No obligation. Privacy.

Evaluation first

Elevations, crack map, drainage and trees before anyone talks about piers.

Written proposal

Method, pier count, price, schedule and warranty terms on paper before work starts.

Plumbing tested

Hydrostatic test before and after the lift so a leak does not undo the repair.

What's included

Everything the job needs, scoped before we start

Every slab foundation repair job in San Antonio includes the work below as standard. It is written into the proposal, so there are no surprise extras on the invoice.

  • Elevation survey of the whole slab with a level, recorded on a floor plan before and after
  • Crack map inside and out, dated, with drainage and trees noted
  • Hydrostatic plumbing test on the drain lines before the lift and again after
  • Written proposal with method, pier count, pier locations, price, schedule and warranty terms
  • Piers pressed to refusal, house lifted in stages with doors and windows checked as it comes up
  • Holes backfilled, shrubs and sod replaced where practical, interior floor patched where interior piers were set
  • City permit pulled by the contractor; engineer's letter arranged when the job calls for it
Concrete pilings stacked in an excavated hole beside a settled slab foundation in San Antonio

Not sure it is structural?

Send a photo with the form. Many San Antonio cracks are seasonal. You will get an honest read before anyone quotes piers.

When to call

Signs you need slab foundation repair

Any of the following is worth an evaluation. Movement on expansive clay is seasonal, so note the month and photograph the crack with a coin for scale.

  • Stair-step cracks in brick veneer at a corner or above a garage door that widen year over year
  • Doors and windows that jam year-round, not just in August
  • A floor that slopes enough to feel, or a marble that rolls to the same corner
  • A slab that is high in the middle and low at the edges, with cracked tile over a kitchen or bath
  • Separation between the brick and the window frames, or a gap opening under the baseboard
  • A crack in the slab itself, seen in a garage or under lifted flooring, with one side higher than the other
  • Previous piers on one side and new cracks on the other

Our process

How slab foundation repair runs, step by step

From the first walk-through to the final elevation record, you will know what is happening, why, and what it costs at each stage.

  1. Step 1: Survey and map

    A level reading every few feet across the slab goes on a floor plan, with every crack photographed and dated. Differential of an inch or more against the rest of the house is movement; a quarter inch after a dry August may be the season.

  2. Step 2: Test the plumbing

    The drain lines under the slab are filled and held under a hydrostatic test. A leak under a heaved area is fixed first, usually by tunneling, because piers cannot hold down a slab that wet clay keeps lifting.

  3. Step 3: Propose in writing

    Method chosen for the soil, pier locations drawn every 6 to 8 feet along the moving section, count, price, schedule and warranty terms. If the honest answer is drainage and a soaker hose, that is what the paper says.

  4. Step 4: Press, lift, test again

    Holes dug at each location, pilings or piers pressed to refusal, the house lifted in stages with hydraulic jacks while doors are checked, shims set, a second plumbing test, holes backfilled, elevations recorded.

Price guide · USD, 2026

What slab foundation repair costs in San Antonio

Typical San Antonio ranges. The final price is in the written proposal after the evaluation. Per-pier prices assume most homes need 8 to 12 piers.

ItemTypical range
Pressed concrete pilings Most homes need 8–12 piers$350–$600 per pier
Pressed steel piers Deeper, mixed soil or shallow rock$1,000–$1,800 per pier
Drilled bell-bottom concrete piers Engineered, cure time$1,200–$2,200 per pier
Typical slab repair (8–12 piers) Concrete pilings; steel higher$4,500–$14,000
Major slab repair (20+ piers) Engineer's plan$15,000–$35,000+
Hydrostatic plumbing test (before and after) Drain lines under the slab$250–$500
Structural engineer's report (Texas PE) When a lender, buyer or insurer needs it$400–$900

Ranges cover labor, materials, permit where noted and cleanup, for 2026. The number on the written proposal is the number you pay; if the plumbing test or the lift changes the scope, work stops and a revised proposal is issued.

Full price guide

In depth

Slab Foundation Repair in San Antonio: how the job actually runs

A slab foundation is a concrete floor poured directly on the ground with a thickened grade beam around the edge, and almost every San Antonio home built after the 1960s sits on one. When the soil under part of the slab moves and the rest does not, the slab tilts or bends, and the house above it shows the strain in brick, drywall and door frames. Slab foundation repair puts piers under the section that moved, lifts it back toward level, and holds it there. You need it when an elevation survey shows real differential, not when a door sticks in August.

Why San Antonio slabs move

The metro sits on two soils with a fault line between them. South and east of the Balcones Escarpment, under Schertz, Cibolo, Converse, the south side and the east side of New Braunfels, the ground is Blackland Prairie clay, and expansive clay swells when it is wet and shrinks when it is dry. After a wet May the edges of a slab lift; through a dry August they drop. A slab that is wetter on one side than the other, because a downspout dumps at one corner or a live oak drinks from the other, tilts. North and west of the fault, under Stone Oak, Helotes, Boerne and Garden Ridge, the ground is Edwards limestone with thin soil, and slabs there sit on lots that were cut and filled flat, bearing on rock at one end and loose fill at the other, so they settle rather than swell.

Two more things push slabs around. Trees, especially live oaks, cedar elms and pecans, pull water from the clay on one side of a house faster than the other. And the cast iron drain lines under 1950s to 1980s slabs corrode through and wet the clay under a kitchen or bath, heaving that part of the floor while the perimeter drops. The full picture is in why San Antonio homes have foundation problems.

Is this an emergency?

Rarely. Foundation movement on clay is seasonal and slow, and most cracks that appear in late summer narrow after the fall rains. The signs that justify an evaluation this week rather than next season are movement that is sudden, a slab dropping after a known plumbing leak or a flood, a floor that heaved and cracked tile over a bathroom, brick cracks that opened wide enough for a coin in a single season, and doors that will not close in any month. The signs, ranked by how much they matter, are in signs of foundation problems in San Antonio homes.

How the evaluation runs

Guessing is expensive, because every guess is a pier you paid for on the wrong side of the house. The sequence is:

  1. Elevation survey. A level reading every few feet across the slab, recorded on a floor plan. The low corner, the high spot over a leak and the flat sections show up as numbers, not opinions.
  2. Crack map. Every crack inside and out, photographed and dated, with the width noted. Brick cracks at corners and above garage doors point at a perimeter drop; a diagonal crack across a kitchen floor points at interior heave.
  3. Water and trees. Where the downspouts end, where water pools, which side has the big tree, and whether a bed against the house is flooded every night by a sprinkler.
  4. Hydrostatic plumbing test. The drain lines are filled and held. A drop means a leak, and a leak under a heaved area changes the plan.

The evaluation is written up whether or not the house needs piers, and on many San Antonio houses the honest answer is drainage correction and a soaker hose, checked again after the next wet season.

Pressed pilings, steel piers or drilled piers

Pressed concrete pilings are 12-inch precast concrete cylinders pressed into the soil one on top of the next, using the weight of the house as the reaction, until the stack refuses to go further. They are the workhorse in deep clay, fast to install and the lowest cost per pier, and they have a long track record across the northeast, south and the I-35 corridor.

Pressed steel piers are steel pipe sections pressed the same way but deeper and more predictably, through mixed soil, caliche and fill, until they reach a consistent bearing or rock. They cost two to four times more per pier and are the answer where concrete pilings refuse within a few feet, which is most of the limestone north side.

Drilled bell-bottom piers are holes drilled 10 to 20 feet, belled at the bottom, reinforced and poured in place to an engineer’s plan. They are the long-standing engineered method in Texas, slower because the concrete has to cure, and the choice when an engineer specifies them or the structure is heavy.

FactorPressed concrete pilingsPressed steel piersDrilled bell-bottom piers
Typical cost$350–$600 per pier$1,000–$1,800 per pier$1,200–$2,200 per pier
Best soilDeep clayMixed soil, caliche, shallow rockAny, to an engineer’s plan
DepthTo refusal in clayTo bearing or rock10–20 ft, belled
Install timeHours per pierHours per pierDays, plus cure
Fits whenNortheast, south, I-35 clayStone Oak, Helotes, Boerne, Garden RidgeEngineered jobs, heavy structures

The three are compared in more detail in pressed pilings vs steel piers vs drilled piers in San Antonio.

The lift

Holes are dug at each pier location along the grade beam, about two feet square and deep enough to get the press under the beam. Pilings or pier sections are pressed to refusal and capped. Hydraulic jacks then raise the house in stages, with someone inside checking doors and windows between stages, until the elevation survey reads close to level or the house tells the crew to stop. Steel shims lock the height, the jacks come out, and the holes are backfilled. Interior piers, where a heaved or dropped section is under the middle of the house, mean breaking out a section of floor, digging, pressing and patching the concrete; flooring restoration over the patch is separate.

A second hydrostatic test after the lift confirms the raise did not open a drain joint. The elevation survey is recorded again and goes in your file with the proposal, the permit and any engineer’s letter, which is what the next buyer’s inspector will ask for.

What it costs

Typical San Antonio ranges, final price in a written proposal after the evaluation. Pressed concrete pilings $350 to $600 per pier. Steel piers $1,000 to $1,800 per pier. Drilled bell-bottom piers $1,200 to $2,200 per pier. Most homes need 8 to 12 piers, so a typical slab repair lands between $4,500 and $14,000, and a major repair with 20 or more piers runs $15,000 to $35,000 and up on an engineer’s plan. The hydrostatic test runs $250 to $500 and an engineer’s report $400 to $900 when a lender, buyer or insurer needs one. The full table and what moves the number are in the cost guide.

Permits, engineers and insurance

Texas does not license foundation repair contractors, so three pieces of paper do the job a license would. The City of San Antonio requires a residential repair permit for structural foundation work inside the city limits, and the suburbs run their own offices; the contractor pulls it. An independent Texas licensed Professional Engineer evaluates and writes the letter when the house, the lender, the buyer or the insurer calls for one. And the warranty terms are in the proposal where you can read them. Insurance usually excludes soil movement and sometimes covers movement caused by a plumbing leak, which is why the hydrostatic test result matters beyond the repair itself; see does homeowners insurance cover foundation repair in Texas.

While you wait

Photograph every crack with a coin for scale and write the month on the photo. Extend any downspout that ends at the foundation. If one side of the house has a bed that is watered nightly and the other side is bare, even it out. Do not dig under the grade beam, jack anything, or break out floor. Then send the form with the neighborhood and what the house is doing, and you will get an evaluation window and, if the house needs it, a proposal with the pier count drawn on the plan.

Last updated September 20, 2026

Questions

Slab Foundation Repair, explained

Straight answers about cost, method, engineer's reports, permits and what to expect from slab foundation repair in San Antonio.

All questions
How do I know my slab needs piers and not just watering?

The elevation survey answers it. A slab that reads within a quarter inch or so across the house after a dry summer, with hairline cracks that close after the rains, is the clay breathing, and the fix is even moisture and drainage. A corner or a side that reads an inch or more low against the rest of the house, with brick cracks you can fit a coin in and doors that jam in every season, has moved and will keep moving. The survey goes on paper either way, so you can compare it after the next wet season before deciding.

Pressed concrete pilings or steel piers for my house?

The soil under your address decides. South and east of the Balcones fault, in Schertz, Cibolo, Converse, the south side and the east side of New Braunfels, the clay is deep and pressed concrete pilings reach refusal at a useful depth at the lowest cost. On the north and northwest limestone, in Stone Oak, Helotes, Boerne and Garden Ridge, pilings stop within a few feet and steel piers press deeper to a consistent bearing. Mixed lots in Shavano Park and Alamo Heights sometimes get both under one house. The proposal names the method and says why.

How many piers will my house need?

Most San Antonio homes need 8 to 12. Piers go every 6 to 8 feet along the section that has moved, so a single dropped corner may take 4 to 6 and a whole side 10 to 14. A house that has rotated on several sides, or a large two-story, can run past 20 and gets an engineer's plan. The count is drawn on the floor plan in the proposal with each location marked, so you can see why the number is what it is and compare it against any other bid.

Will the lift crack my drywall or brick?

Lifting a house back toward level moves the same parts that moved when it dropped, so some cracks close and a few new hairlines can open in drywall, especially at door frames and ceiling corners. Brick that cracked on the way down usually closes most of the way on the way up but rarely disappears; tuckpointing is cosmetic work after the lift. The house is raised in stages with doors and windows checked between stages to keep it gentle. Cosmetic repair after a lift is not included in pier pricing and is stated as such in the proposal.

Why do you test the plumbing before piers?

Because a leaking drain under a slab is behind a large share of heaved interiors in 1950s to 1980s San Antonio homes, and piers cannot hold down a slab that wet clay keeps lifting. The hydrostatic test fills the drain lines and holds them; a drop means a leak. Fixing it first, usually by tunneling under the slab so the floors stay intact, makes the lift stick. A second test after the lift confirms nothing opened during the raise. On a house with a failed test, the leak repair is quoted separately and sometimes brings the insurer into the picture.

Does foundation repair need a permit in San Antonio?

Yes. Inside the city limits the City of San Antonio Development Services Department requires a residential repair permit for structural foundation work, and an engineer's letter is often part of closing it out. Alamo Heights, Castle Hills, Schertz, Cibolo, New Braunfels, Boerne and the other suburbs each run their own permit office. The contractor pulls the permit and it is included in the written proposal. Because Texas does not license foundation contractors, the permit and the engineer's letter are the paperwork that stands in for a license.

Is a slab repair covered by insurance?

Movement from the soil swelling and shrinking is generally excluded by Texas homeowners policies. Movement caused by a plumbing leak under the slab may be covered in part, depending on the policy and any foundation or seepage endorsement, and often with a cap. The hydrostatic test result, dated photos and an engineer's report are what the adjuster asks for, and the failed section of drain is kept for the claim. Read the declarations page and call the agent before work starts.

Related services

  • Foundation Leak Repair

    Hydrostatic testing, tunneling under the slab and drain repair when wet clay is heaving one side of the house.

  • Foundation Leveling

    Lifting a settled house back toward level in stages, doors closing again, and a written elevation record.

  • Foundation Inspection

    Elevation survey, crack mapping and an honest read on whether the house needs piers, drainage or just watching.

Helpful reading

Guides that go with this service

Practical, San Antonio-specific reading on costs, signs, soil, watering, methods, insurance and real estate.

Foundation crew excavating pier holes along the edge of a San Antonio slab at dusk

Slab Foundation Repair

Get the honest answer before you get a pier count.

Slab Foundation Repair across San Antonio and the metro. Tell us what the house is doing and get an evaluation window and a written proposal, only if the house needs work.